Specification-to-commissioning delivery with documented handover for resilient solar and storage systems.

Two installers placing a solar module onto roof mounting rails.

Who this is for

Households · Commercial facilities · Public-sector campuses

Iran (Full calculator support) · Other markets (Discovery / consultation)

Included

  • Coordinated delivery plan
  • Commissioning script

What you leave with

  • Operable system within scope
  • Handover pack

Not included

  • Unlimited scope growth
  • Utility work we cannot perform

Turnkey deployment is how an approved design becomes an operable system. Solarun coordinates procurement, construction, interconnection support, and commissioning so the people who will live with the system can rehearse backup behavior. Residual risk stays labeled at handover.

Who this is for: Households; Commercial facilities; Public-sector campuses. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).

Problems we help you name: Installers disappear before backup is proven. Handover notes are verbal only.

A typical engagement includes Coordinated delivery plan; Commissioning script. It does not include Unlimited scope growth; Utility work we cannot perform.

You provide Approved design package; Site access windows. You leave with Operable system within scope; Handover pack.

1. Specify: Lock equipment and construction scope against the approved concept. 2. Build: Install to the documented sequence with site safety controls. 3. Hand over: Commission behavior the operator can rehearse and sign.

Related services

Related questions

What does a typical installation sequence include?

After an approved design: site preparation, mounting, electrical works, interconnection coordination, and a commissioning rehearsal you can witness. Safety practice on roofs includes fall protection. Exact duration depends on access, weather, and utility steps we do not control.

What does maintenance usually cover?

Planned visits for inspection, cleaning where specified, inverter checks, and a written punch list. Emergency response times are defined in the care agreement, not assumed. Seasonal reviews compare operating notes to the original assumption log.