Turnkey deployment
Commissioning
Witnessed backup and control behavior so operators know what the system will and will not do.

Who this is for
Households · Commercial facilities · Public-sector campuses
Iran (Full calculator support) · Other markets (Discovery / consultation)
Included
- Witnessed sequence
- Exception log
What you leave with
- Signed commissioning notes
Not included
- Infinite re-tests outside scope
Commissioning is the rehearsal, not the brochure. We run the documented backup sequence, record exceptions, and leave notes a facilities team can repeat. Browser demos are never a substitute for this gate.
Who this is for: Households; Commercial facilities; Public-sector campuses. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).
Problems we help you name: Nobody on site has seen a transfer.
A typical engagement includes Witnessed sequence; Exception log. It does not include Infinite re-tests outside scope.
You provide Operator availability. You leave with Signed commissioning notes.
1. Specify: Lock equipment and construction scope against the approved concept. 2. Build: Install to the documented sequence with site safety controls. 3. Hand over: Commission behavior the operator can rehearse and sign.
Related services
Related questions
What does a typical installation sequence include?
After an approved design: site preparation, mounting, electrical works, interconnection coordination, and a commissioning rehearsal you can witness. Safety practice on roofs includes fall protection. Exact duration depends on access, weather, and utility steps we do not control.
What will we see in monitoring?
The points listed in your monitoring scope: typically inverter status, selected loads, and agreed alerts. Freshness is defined. Administrator-maintained values are not called “live.”