Turnkey deployment
Commercial commissioning package
A packaged handover for facilities teams that need rehearsed backup, not a mystery switchover.

Who this is for
Commercial facilities · Public-sector campuses
Iran (Full calculator support) · Other markets (Discovery / consultation)
Included
- Multi-role walkthrough
- Handover dossier
What you leave with
- Facilities-ready notes
Not included
- Unlimited training hours
The commercial package adds operator walkthroughs, labeled residual risk, and monitoring handoff suitable for multi-shift sites. It does not promise zero product loss across every outage scenario.
Who this is for: Commercial facilities; Public-sector campuses. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).
Problems we help you name: Night-shift staff were never briefed.
A typical engagement includes Multi-role walkthrough; Handover dossier. It does not include Unlimited training hours.
You provide Shift contacts. You leave with Facilities-ready notes.
1. Specify: Lock equipment and construction scope against the approved concept. 2. Build: Install to the documented sequence with site safety controls. 3. Hand over: Commission behavior the operator can rehearse and sign.
Related services
Related reading
Related questions
How does Solarun approach commercial continuity?
We start with outage exposure for the processes that actually stop revenue or spoil product, then size solar, storage, and controls around that list. Residual risk stays labeled. The commercial continuity calculator explores Iran Full-pack ranges; it is not a capex approval.