Turnkey deployment
EPC and construction
Field construction with documented safety practice, sequencing, and respect for roof and structure limits.

Who this is for
Households · Commercial facilities · Public-sector campuses
Iran (Full calculator support) · Other markets (Discovery / consultation)
Included
- Installation to issue set
- Daily site notes
What you leave with
- Installed plant within scope
Not included
- Unspecified civil works
EPC crews install to the approved layout: rail geometry, weather sealing, cable management, and working-at-height controls. We do not stand on module glass or skip fall protection for a photograph.
Who this is for: Households; Commercial facilities; Public-sector campuses. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).
Problems we help you name: Unsafe improvisation on roofs. Conduit routes that fight the design.
A typical engagement includes Installation to issue set; Daily site notes. It does not include Unspecified civil works.
You provide Access and storage space. You leave with Installed plant within scope.
1. Specify: Lock equipment and construction scope against the approved concept. 2. Build: Install to the documented sequence with site safety controls. 3. Hand over: Commission behavior the operator can rehearse and sign.
Related services
Related questions
What does a typical installation sequence include?
After an approved design: site preparation, mounting, electrical works, interconnection coordination, and a commissioning rehearsal you can witness. Safety practice on roofs includes fall protection. Exact duration depends on access, weather, and utility steps we do not control.
How does Solarun treat site safety during construction?
Construction follows the documented method: harnesses and helmets where required, no standing on module glass, and daily notes. We do not publish a “zero accidents” statistic because that would be an unverified public claim.