All services

Advisory and engineering

Permitting and regulatory support

Sequenced support for interconnection, municipal, and documentation steps without pretending Solarun is the utility.

Empty municipal permit window with a ticket dispenser and no readable numbers.

Who this is for

Households · Commercial facilities · Public-sector campuses

Iran (Full calculator support) · Other markets (Discovery / consultation)

Included

  • Document checklist
  • Package assembly and status log

What you leave with

  • Submitted package record
  • Outstanding-item list

Not included

  • Issuing permits ourselves
  • Guaranteed approval dates

Permitting support prepares complete, honest packages for the authorities that actually decide. Timelines belong to those authorities. We document what we submitted, what remains outstanding, and what the customer still must sign.

Who this is for: Households; Commercial facilities; Public-sector campuses. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).

Problems we help you name: Applications start after equipment is already on site. Missing owner signatures stall interconnection.

A typical engagement includes Document checklist; Package assembly and status log. It does not include Issuing permits ourselves; Guaranteed approval dates.

You provide Owner identity documents as required; Design package. You leave with Submitted package record; Outstanding-item list.

1. Listen: Document how the site fails today and which loads matter. 2. Frame: Compare options against those loads and the applicable market pack. 3. Record: Write assumptions, exclusions, and the next decision gate.

Related services

Related questions

When can a site join contracted VPP buyouts?

After interconnection, metering, and controls meet the readiness checklist, and after both parties sign. Eligibility is not automatic with a solar installation. Buyout rates are not published on this website; they belong in the contract, not in marketing copy.

Does Solarun decide when the utility energizes the site?

No. We prepare packages and coordinate, but energization belongs to the utility. We keep an outstanding-item list so you can see what is still outside our control.