All services

Smart energy and storage

EV charging infrastructure

Workplace and campus charging planned against electrical capacity and backup priorities—not as an afterthought pedestal.

Workplace EV chargers in a courtyard beside a building with rooftop solar.

Who this is for

Commercial facilities · Public-sector campuses · Households

Iran (Full calculator support) · Other markets (Discovery / consultation)

Included

  • Capacity and shed plan

What you leave with

  • Charging scope note

Not included

  • Vehicle supply

EV charging can compete with backup loads if nobody says so out loud. We plan circuits, diversity, and whether charging sheds during islanding. Brand-specific charger logos are not implied.

Who this is for: Commercial facilities; Public-sector campuses; Households. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).

Problems we help you name: Chargers added on the backup bus by accident.

A typical engagement includes Capacity and shed plan. It does not include Vehicle supply.

You provide Parking layout; Fleet or employee mix. You leave with Charging scope note.

1. Prioritize: Name the loads, duration, and control points that matter. 2. Integrate: Connect storage, charging, or monitoring to that plan. 3. Prove: Show backup and coordination behavior in a labeled commissioning script.

Related services

Related questions

Can EV chargers stay on during backup?

Only if the shed plan says so. Charging often yields to refrigeration, IT, or life-safety loads. We write that choice down during smart-energy design.