Smart energy and storage
EV charging infrastructure
Workplace and campus charging planned against electrical capacity and backup priorities—not as an afterthought pedestal.

Who this is for
Commercial facilities · Public-sector campuses · Households
Iran (Full calculator support) · Other markets (Discovery / consultation)
Included
- Capacity and shed plan
What you leave with
- Charging scope note
Not included
- Vehicle supply
EV charging can compete with backup loads if nobody says so out loud. We plan circuits, diversity, and whether charging sheds during islanding. Brand-specific charger logos are not implied.
Who this is for: Commercial facilities; Public-sector campuses; Households. Markets: Iran (Full calculator support); Other markets (Discovery / consultation).
Problems we help you name: Chargers added on the backup bus by accident.
A typical engagement includes Capacity and shed plan. It does not include Vehicle supply.
You provide Parking layout; Fleet or employee mix. You leave with Charging scope note.
1. Prioritize: Name the loads, duration, and control points that matter. 2. Integrate: Connect storage, charging, or monitoring to that plan. 3. Prove: Show backup and coordination behavior in a labeled commissioning script.
Related services
Related questions
Can EV chargers stay on during backup?
Only if the shed plan says so. Charging often yields to refrigeration, IT, or life-safety loads. We write that choice down during smart-energy design.