Engineering and market intelligence
Storage safety documents you should actually receive
Siting, clearances, and fire-safety paperwork as a handover expectation—not a certification logo wall.

A storage handover should include siting drawings, clearance notes, and the manufacturer safety files that apply to the equipment you actually received. If a certificate is shown publicly, it must be an approved, in-date certification record—not a decorative badge.
Solarun does not currently publish ISO certificates on this site because approved public certificate records are not in the seed evidence set. The absence is filled with this documentation practice, not with invented registrar names.