A plain interconnection checklist
Owner signatures, metering, protection intent, and outstanding utility items—without a fake approval date.

Keep a running list: application submitted, owner signature, meter plan, protection intent, utility comments, outstanding hardware, energization. Anything in the utility column is not a Solarun promise.
VPP enrollment is a later row, not the same row as interconnection.