All Knowledge Hub articles

Engineering and market intelligence

A plain interconnection checklist

Owner signatures, metering, protection intent, and outstanding utility items—without a fake approval date.

Gloved hand holding a checklist beside a closed utility meter box.

Keep a running list: application submitted, owner signature, meter plan, protection intent, utility comments, outstanding hardware, energization. Anything in the utility column is not a Solarun promise.

VPP enrollment is a later row, not the same row as interconnection.