From consult to commissioning: a home sequence

The gates a household should expect—without a fake project diary.

Hallway of a modest home opening toward an empty roof terrace before installation.

A calm home project has gates: listen, write loads, design, permit, build, interconnect, commission, train. Skipping a gate is how “the kettle stayed on” stories start.

You should see assumptions written before hardware is ordered. You should witness backup behavior before the crew leaves. You should know which outlets are not on the critical set.

This sequence is methodology, not a completed Solarun villa case.