Planning scenario: facility continuity in Tehran

An educational commercial scenario for ranked process loads and rehearsed backup—labeled projected, not measured.

Context: Educational scenario for a commercial facility in Tehran considering solar, storage, and operator handover. Not a verified Solarun installation.

Challenge: Refrigerated lines and a control room cannot tolerate unmanaged multi-hour interruptions, but the rest of the site can shed.

Prioritized loads: Control room, selected refrigeration, emergency lighting, communications. Process lines that can stop are documented as residual risk.

Approach: Audit how the site fails, write the ranked list, then design storage and solar around that list.

System concept: Rooftop array, commercial battery room, monitoring with an agreed freshness, VPP-ready controls only if a later contract applies.

Process: Advisory, design, construction, commissioning the facilities team can rehearse.

Outcomes (illustrative): Priority loads stay in the planning narrative through a multi-hour event. No measured kWh, no customer quote.

Limitations: Utility interconnection timing is outside Solarun’s control. Peak-shaving $ figures are calculator ranges, not invoices.

Next step: Commercial continuity calculator and an audit conversation.